Exterior storm drain subsidy update
Halton updated the Exterior Storm Drain Disconnection guidance, application, and waiver with new eligibility proof, submission instructions, and subsidy terms.
See more
Halton revised the Exterior Storm Drain Disconnection page and the supporting subsidy application and waiver. The subsidy still shows a 100% cost share up to $6,500, but the requirements now add specific proof of a pre-existing wastewater connection, pre- and post-construction evidence, and a completed permit/inspection trail where applicable. The application process now requires a signed application form and waiver, an itemized paid-in-full invoice, contractor confirmation, and supporting evidence such as a Household Drainage Survey, photos, CCTV footage, or dye test results. The page also adds updated submission guidance, including the basementfloodingsubsidy@halton.ca email, Dropbox instructions, mail-in and in-person drop-off options, and new homeowner and contractor guide links.