Should you ask the CRA for SR&ED pre-claim approval?

Consider optional SR&ED pre-claim approval if your business meets the Canada Revenue Agency (CRA) criteria and is planning work with a clearly defined scientific or technological uncertainty. The process gives you an assessment of planned work before significant spending. You still file the SR&ED claim and support the actual work and costs for each tax year. CRA pre-claim approval
Who can apply?
The CRA lists Canadian corporations, including Canadian-controlled private corporations, and partnerships. The business must be in good standing and have less than $25 million in gross business income. The planned work must meet the eligibility requirements. A project previously included in an SR&ED claim is outside the pre-claim process. If work has recently begun, check the exact circumstances with CRA before assuming the route is closed. CRA eligibility criteria for pre-claim approval
Scroll horizontally to see all columns.
Project stage | What to check |
|---|---|
Work planned | Business and project criteria, existing approaches and intended experiments |
Work recently started | Review the current CRA guidance and facts |
Work previously claimed | Pre-claim criteria exclude a project previously claimed |
Regular claim route | Prepare and support the claim using regular procedures |
The gross-income threshold applies to this optional service. Assess regular SR&ED claims using the program’s work eligibility and claimant rules. The SR&ED eligibility guide provides a starting point for that assessment.
What do you submit to the CRA?
Start by getting a case number following the CRA instructions. Use the application to describe the technological knowledge sought, the uncertainty, and the planned experiments or analysis. The form allows up to three projects and asks about planned work for a pre-approval period of up to three years. Upload supporting documents through My Business Account with the assigned case number. Prepare the person who understands the technical work to attend the meeting. CRA instructions for completing an application
Scroll horizontally to see all columns.
Application material | What it should explain |
|---|---|
Planning brief | Objective, scope, start date and team roles |
Existing knowledge | Earlier approaches and the outstanding technical question |
Experiment plan | Hypotheses, trials or analyses and what to record |
Documentation plan | How work, costs and changes will be recorded |
In a fictional manufacturing project, a team might propose testing an inspection method under lighting and speed constraints. Its packet could include a supplier baseline, investigation notes, a short trial plan, and the person responsible for keeping records. Link the application to the same internal project code the technical and finance teams will use during the work.
What happens to the eventual tax claim?
Keep your determination letter and compare its project scope with what actually happened. When filing, document the actual work and expenditures and identify changes. Where the CRA selects a claim with pre-approved work for an expenditure-only review, it generally processes the complete claim within 90 calendar days of receipt. A broader review can apply if a project changed significantly or if the filing also includes other projects. CRA review guide for pre-approved projects
Scroll horizontally to see all columns.
Review route after receipt of a complete claim | CRA timing |
|---|---|
Expenditure-only review with pre-approved work | Generally within 90 calendar days |
Refundable claim selected for review | 180 calendar days service standard |
The thresholds shown represent different CRA processing pathways. They start from receipt of a complete claim and apply after filing. The optional application has a separate process and schedule. For the annual service results, see how the CRA reviews claims. CRA review guide
How long does the approval process take?
After a request for a case number, the CRA says existing SR&ED claimants in good standing are contacted within two business days through My Business Account. Other businesses are contacted by phone within five business days. The CRA gives a separate period of eight weeks after a complete application is submitted for the written pre-claim decision. Getting a case number and submitting a complete application are different milestones. CRA case-number request · CRA guidance after applying
Scroll horizontally to see all columns.
Starting event | CRA action and timing |
|---|---|
Case-number request, existing claimant in good standing | Contact in My Business Account within two business days |
Case-number request, other business | Phone contact within five business days |
Complete pre-claim application submitted | Written decision within eight weeks |
Existing claimants in good standing may be asked to attend a meeting. For other businesses, the meeting is mandatory. The CRA estimates two to five hours. Reserve time for the person who understands the planned technical work and can explain what the team will test, who will do it and how results will be documented. The CRA may ask to see the facilities, including virtually. CRA guidance after applying
What should you do if the project changes?
Set up a record with the approved scope, the date of the determination, the proposed work and any applicable period before the project begins. When a change arises, record its date, why it was needed and which hypothesis, method, facility or work package it affects. This helps the technical team identify what is covered by the determination and helps finance reconcile the work that actually took place.
For example, a manufacturer may plan to test whether a coating retains its quality at a lower curing temperature. If the team later changes the coating material and the intended technical outcome, the original determination may require another look. Compare the change with the approval report and follow the CRA’s guidance about whether to contact it or submit a revised application. When the eventual claim is prepared, document the work and expenditures for the corresponding year. CRA guidance after applying
How to decide whether to use the process
Confirm the business and project criteria before assembling the application.
Ask the technical lead to write the uncertainty in one sentence and identify the existing approaches considered.
Attach the first set of hypotheses and the records you plan to keep.
Assign the project owner and agree how finance will track work and costs.
Keep an original scope and a record of material changes. When the work is done, use the corporate SR&ED filing checklist to prepare the claim.
About the author




