What happens when the CRA reviews your SR&ED claim?

If the Canada Revenue Agency (CRA) selects your SR&ED claim for review, it may examine the eligibility of the work, the associated expenditures, or expenditures alone. Have your technical lead and finance lead prepare the same project timeline with links to contemporaneous evidence. A selection notice means the CRA needs information to assess the claim. CRA guide to the SR&ED review process
What happens after the CRA contacts you?
Start by confirming the tax year, the scope of review, the projects selected, the contact person, and any response date. The CRA may ask for records before the meeting. Prepare the specific documents requested, keep a copy of what you send, and maintain a list of questions that still need an answer.
Scroll horizontally to see all columns.
Stage | What to organize | Who can help |
|---|---|---|
First contact | Notice, year, scope and dates | Claim coordinator |
Before the meeting | Technical timeline and reconciliation | Technical lead and controller |
Meeting and follow-up | Dated records and requested clarifications | Staff with direct knowledge |
Findings | Proposed and final findings by project and cost | Claim coordinator and tax team |
The technical discussion may cover what was unknown, what your team tested, and what it learned. For expenditures, prepare a reconciliation from work records to the claim, including the payroll, invoices, contracts, and applicable government assistance. The questions and documents vary with the review. CRA review guide · Get ready to claim
How long can an SR&ED review take?
The CRA’s service standard for a complete refundable claim selected for review is 180 calendar days. In FY 2025–26 it processed 92.5% of refundable claims selected for service or review within 180 days. It processed 95% of claims accepted as filed during workload selection within 60 days. Each figure applies to its own group. Use the standard for cash-flow planning with room for case-specific timing. CRA annual statistics · CRA review guide
Some claims with pre-approved projects may be selected for an expenditure-only review, which the CRA generally processes within 90 calendar days of receiving a complete claim. Significant changes to the approved work or the presence of other projects may bring the technical work into scope. The CRA review guide states that a non-refundable claim selected for review has no processing service standard. CRA review guide
Build a review file that both teams can use
Technical narrative. Use one short timeline linking the uncertainty, hypotheses, work performed, test results, and conclusions for each selected project.
Evidence index. Give files descriptive names and include dates, author or owner, related claim line, and their source location.
Financial reconciliation. Tie the expense claim back to payroll and the ledger. Document allocation assumptions and any assistance affecting the project.
Meeting owners. Ask the technical lead to explain what the team tried. Ask finance to explain cost treatment and supporting records. Record who will answer follow-up questions.
For a manufacturing example, the engineer can explain why the standard setup failed under the design constraints. The controller can then show how the documented trial hours link to the amounts claimed. See how to document a manufacturing experiment and the corporate filing checklist.
How have processing results changed over time?
The CRA reported that 94.1% of refundable claims selected for service or review met the 180-day window in 2023–24, followed by 90.0% in 2024–25 and 92.5% in 2025–26. Across the five fiscal years shown, performance ranged from 90% to 98%. Each figure describes a group of claims in a reporting period. The chart tracks the published shares of claims within 180 days and gives context for timing when a company is planning cash flow. CRA annual statistics
What does a response file look like in practice?
Suppose the CRA asks for the evidence behind the pilot trials in one claimed project and the wages charged to those trials. Start with the specific request and use the project’s original identifiers. The technical lead prepares a dated timeline with each hypothesis, documented change and recorded result. Finance reconciles time entries and payroll to the amounts in the claim. The coordinator indexes both sets of records using the same trial IDs.
Scroll horizontally to see all columns.
Request | What to attach |
|---|---|
Support for technical trials | Dated procedure, raw results, test log and a short explanation of the conclusion |
Wages charged to the trials | Time-entry summary, payroll records and a reconciliation to the amount under review |
Treatment of a gap | Which record is missing, which contemporaneous documents remain and what they substantiate |
If a time record covers experimental work and regular operations, document how the hours were assigned and retain the original source. If a particular test record is missing, identify the gap and which contemporaneous documents remain. A clear response can describe evidence quality without overstating what the file proves. CRA review guide · CRA records guidance
After the meeting, keep a simple tracker with the date of each request, the person responsible, the documents sent and the response date. Preserve the exact package submitted and note any clarification that changes the original explanation. If a question covers a tax year or project outside the original request, clarify the scope before collecting records across the wider business.
What if the CRA proposes an adjustment?
Read the proposed findings by project and expenditure category. Clarify the reason for each adjustment and provide any relevant missing evidence in the period the CRA gives you. Keep a record of the final position with the supporting documents. If the notice raises a disagreement, consult the CRA guidance on responses and recourse. CRA review, findings and recourse