How to document manufacturing experiments for SR&ED

A manufacturing experiment log should show what your team could not resolve using available methods, what it tested, what it measured, and what it learned. Keep it as the work happens and link each trial to dated technical evidence and related costs. The CRA evaluates the actual work using its criteria for technological advancement and systematic investigation. CRA guidelines on eligible work · Form T661 project description
Define the technical uncertainty at the start
Imagine a fictional manufacturer that needs to detect shallow dents on reflective metal parts at 120 parts per minute. At that speed, the current setup confuses reflections with defects. Before the team starts changing hardware, document what the standard settings and supplier documentation can achieve, the unresolved constraint, and the approaches already reviewed. Keep a dated record of prior-art and vendor searches. How to research prior art for SR&ED
In this example the target is fewer than 2 missed defects per 100 known defective samples. Fix the line speed and sample set for each trial. If you change several settings together, note how that limits the conclusions and plan isolated follow-up tests. These are sample experiment design choices for a fictional project.
An annotated manufacturing experiment log
In the example, technicians changed illumination and exposure settings and measured the number of missed defects against the same sample size. The last trial crossed the sample target once. A repeat with an independent batch is the next step before making a reliability claim.
Scroll horizontally to see all columns.
Fictional trial | Change from baseline | Missed out of 100 | Lesson or next step |
|---|---|---|---|
A · Baseline | Standard lighting and exposure | 12 | Document glare in raw images |
B · Lighting | Diffuse illumination at fixed exposure | 5 | Glare fell in this sample |
C · Exposure | Shorter exposure with diffuse light | 3 | Review misses near the part edge |
D · Geometry | Reposition light at the same exposure | 1 | Repeat with an independent lot |
Write the raw evidence filename or location beside each result. Preserve the settings, raw captures, software or firmware version, operator notes, and reason for any excluded trial. Add a short conclusion that tells the next engineer what to change and why.
What should an evidence record contain?
Project and trial identity. One project code, a trial ID, date, operator and version of the setup.
Hypothesis and controls. State the expected result, changed variable, fixed variables, sample method and acceptance criteria.
Result and conclusion. Keep observations, failures and anomalies. Explain what was learned and what decision it changed.
Links to supporting records. Add data, photos, inspection reports, time entries, material records and relevant supplier invoices. Use the actual technical work dates.
Track production, customer acceptance testing, routine quality control and commercial rollout alongside the experimental timeline when teams share a cost centre. Identify the purpose of each activity and reconcile the related hours. That makes the boundary visible when form T661 asks what work you performed in the tax year. CRA T661 instructions
How do you tell whether the improvement holds up?
The example’s final trial missed one defect out of 100 known defective parts under controlled conditions. To see how it behaves on new samples, suppose the team repeats the test on a separate lot with 100 known defective parts and 100 reference parts without dents. It misses 3 defects and flags 4 good parts for rejection. Record both errors. A missed defect affects outgoing quality, and a false reject adds inspection or rework. They also have different denominators.
The two results answer different questions. The original trial helped identify a promising configuration. The new lot tests whether that result holds up when the samples change. Since the new lot missed three defects against the target of fewer than two, the team has work to do. Compare the missed parts by finish, geometry or defect position and write the next hypothesis before changing the setup again. Record which settings and sampling conditions stayed fixed.
Connect the trial log to Form T661
Scroll horizontally to see all columns.
Form T661 line | What to connect from the trial log |
|---|---|
242 · Uncertainties | The technical limit and the available methods considered |
244 · Work performed | Dated hypotheses, changes and results from this tax year |
246 · Advancements | What the trials established, including unresolved limits |
For the fictional project, the uncertainty might concern detecting shallow dents on reflective surfaces at the specified cadence. The work record can then describe how the team changed illumination, exposure and geometry, followed by the new-lot test. The advancement explanation should state what the tests established about the conditions under which the approach worked and where it remained unreliable. Use only the work and evidence relevant to the tax year being described. CRA Form T661 project description
Keep raw results linked to each test even when a conclusion is revised. If the team retests after a review, add a dated record with a new trial ID so later evidence stays distinguishable from the original experiment.
How should finance use the log?
At month-end, match dated trial records to personnel time, purchasing and accounting records. Have the project owner explain any time allocation across regular operations and experimental work. Have finance document the treatment of contractors, relevant assistance, and other expenses under the applicable rules. Keep the ledger and source documents linked to the work package so they can be reviewed together.
Use the SR&ED eligibility guide to assess the underlying work, the filing checklist for the corporate submission, and the CRA review walkthrough to prepare for follow-up questions. CRA records guidance