Québec public tenders: a bid/no-bid worksheet

Before bidding on a Québec public tender, decide whether you can prove eligibility, submit a compliant bid and deliver the work at the price you plan to quote. Read the tender documents and addenda first. They determine the applicable requirements, deadlines, submission format and evaluation method. Start with Québec’s guidance on finding and analyzing opportunities.
Fictional example: municipal fleet maintenance
A supplier with two service crews finds a tender for preventive maintenance on 40 municipal vehicles. The fictional tender closes on December 15, 2026 at 11 a.m. Eastern time. Questions are due December 8 at noon. The team sets a December 11 internal decision deadline.
Mandatory eligibility. The notice requires a current authorization specified in its eligibility clause. The compliance lead checks the required document, entity name, expiry and tender clause by December 9. Status: verified for the bidder.
Mandatory conformity. The tender calls for a signed price schedule, the prescribed declarations and electronic submission by 11 a.m. The bid coordinator checks the required forms and signature, tracks addenda and plans to obtain the submission receipt. Status: draft, with a December 14 package review.
Quality. The fictional evaluation awards points for the service plan and similar contracts. The service manager prepares two references and shows how the dispatch schedule meets the required response times. Status: references ready, staffing evidence pending.
Capacity and price. During the planned month the supplier has 160 crew-hours available. It estimates 140 hours for scheduled work and needs 30 hours of reserve for urgent calls. The total requirement is 170 hours, a 10-hour shortfall. Finance also needs a subcontractor quote before confirming margin.
Clarification. The coordinator asks the authorized contact before the question deadline whether subcontracted capacity is permitted and whether weekend coverage is included in the response time. Check any published addendum before updating the decision.
Decision on December 11: no bid if the 10-hour gap remains or the team cannot demonstrate delivery. Revisit the decision before closing if an addendum resolves the question and the supplier can document capacity and pricing.
Copy this bid/no-bid worksheet
Record the reference, buyer, document version, addenda, question deadline, closing timestamp and submission channel.
For each eligibility condition, record the clause, proof, owner, due date and status. Flag any unresolved mandatory requirement.
For each conformity requirement, record the form, signature, format, deadline and reviewer. Include addenda and the submission receipt.
For each quality criterion, record the published weighting or minimum score if specified, the evidence and the owner.
Confirm available staff, equipment, subcontractors, cash needs, insurance or security where required, delivery dates and price margin. Record the unanswered questions, response owner and decision deadline.
Record bid, hold until a named issue is resolved, or no bid, with the owner and reason. If you ordered documents and decide against bidding, follow the instructions on the non-participation questionnaire included in the tender documentation.
Use Québec’s analysis worksheet, criteria worksheet and decision tool, available in French. The SEAO supplier record explains how to find notices and order documents.