What NRC IRAP funds between prototype and pilot

The National Research Council of Canada Industrial Research Assistance Program (NRC IRAP) has publicly disclosed projects that build working prototypes, improve a prototype already in use or prepare technology for field trials. The distinction matters for a business setting its next R&D milestone. Building something that works on a bench and proving it will work in a customer’s operation are different jobs.
What the NRC IRAP disclosures show
helloDarwin Funding Intelligence contains 6,005 records dated 2024–2025 from its dedicated public NRC IRAP source. 5,330 had usable project descriptions, and 5,997 had positive disclosed amounts. In the English and French descriptions, 137 records matched a narrow text screen for prototype, piloting or pilot plant terminology. The median disclosed amount across those 137 records was $75,000 CAD.
The screen identifies examples worth reading. Projects described through other terms may also involve testing, and the underlying records may contain several agreement disclosures for one business. The median is for this keyword sample, which cannot establish a funding amount for a new applicant. NRC disclosures on the Open Government Portal
How much was disclosed for prototype and pilot work?
137 keyword-matched disclosures · 2024–2025. helloDarwin Funding Intelligence, public disclosures.
Scroll horizontally to see all columns.
Agreement start | All NRC IRAP records | With usable descriptions | Keyword matches | Median for matches |
|---|---|---|---|---|
2024 | 3,078 | 2,412 | 48 | $75,000 |
2025 | 2,927 | 2,918 | 89 | $75,000 |
Combined | 6,005 | 5,330 | 137 | $75,000 |
Fifty of the 137 keyword matches had disclosed amounts of $100,000 or more. Another 68 fell between $50,000 and under $100,000, while 19 were below $50,000. The number of descriptions available to screen was higher in 2025. The change in matches therefore reflects, in part, what the source gives us to search. Use the table to understand what the screen found and keep the full sample separate when making comparisons.
Three ways businesses have defined their technical milestone
Build and test a hardware component
In the NRC disclosure data, a $101,000 2025 agreement for Drift Golf described work on an integrated hardware and software product. The hardware work covered engineering and testing a wind sensor and producing 30 units. The aim was to get the sensor ready for manufacturing. An early hardware milestone like this can be framed around what needs to be measured reliably, under what conditions and how the readings will be integrated into the product. Drift Golf’s funding agreement
Improve a prototype for industrial users
A $150,000 2025 agreement for Emily Thorn Corthay Inc. described improvements to a prototype industrial energy management system that uses AI. The proposed work included modelling peak electricity demand and emissions for mineral processing. This is a different phase because the company started with an existing prototype. A project budget at that point can connect each planned improvement to a known problem, the engineering work required and the test that determines whether the improvement is ready. Emily Thorn Corthay’s funding agreement
Move from a working prototype to field deployment
In an NRC impact profile, Tessellate Robotics describes receiving IRAP support to build early working prototypes and hire its first technical team. NRC reports that the company later tested its navigation system in real-world conditions. That later milestone shows what a pilot adds: evidence from the environment where the system has to operate. The profile gives project context beyond the disclosure dataset and provides no agreement amount for this example. NRC profile of Tessellate Robotics
Build your application around a test you can explain
Identify the technical uncertainty. For example, can a device produce consistent readings when temperature, vibration or the operating environment varies?
Describe the starting evidence. Use actual design, lab or prototype results and identify what remains to prove.
Budget the work in stages. Connect engineering time, components, integration and testing to milestones. Check the funder’s rules before deciding what to include as eligible expenses.
Set the acceptance criteria. List the data you will collect, the conditions the system must handle and the decision you will take if it falls short.
Plan the next step. Explain what a successful test would let you build, validate or deploy afterward.
NRC offers advisory services and may provide financial support for eligible technology innovation projects. Its funding page explains who can apply and how to begin the conversation. NRC IRAP financial support guidance
What evidence is useful at each stage?
Scroll horizontally to see all columns.
Stage | Question to answer | Evidence to prepare |
|---|---|---|
Prototype | Can the technology perform its main function? | Bench results, design sketches, variables tested and remaining failure modes |
Validation | Can it perform consistently under specified conditions? | Test plan, data from repeated runs and pass criteria |
Pilot | Can the technology operate in a representative setting? | Pilot site, operating envelope, integration plan and decision criteria for deployment |
A proposal is easier to assess when the test leads to a clear decision. Explain what you will do if the results meet the target and what you will investigate if they fall short.
About the author




