Alberta-Pacific’s $6 million pulp mill heat recovery project

Emissions Reduction Alberta (ERA) lists $6 million in funding for Alberta-Pacific Forest Industries’ kraft pulp mill heat recovery project. The mill used heat from its recovery boiler exhaust to heat water on site. That freed up steam to generate electricity. It also exposed the project to a problem any mill considering the technology would have to solve: how to keep the equipment working in a corrosive, particle-laden exhaust stream. ERA project profile
What the mill had to build and verify
The project installed a heat exchanger and stack connected to the recovery boiler. The exchanger used the exhaust to heat process water and preheat boiler feedwater. Corrosion-resistant stainless steel protected components exposed to the cooled gas. A daily water wash helped manage particulate buildup. The distinction matters for budgeting: the operating requirements determined some of the equipment and maintenance costs. Final project report
Scroll horizontally to see all columns.
Measure | What the project report describes |
|---|---|
Project completed | 2022, according to ERA |
Operating period used for calculation | October 13, 2022 to September 11, 2023 |
Electricity attributed to steam savings | 37,842 MWh, calculated from operating results |
Associated emissions reduction | Approximately 14,118 tonnes of CO₂ equivalent, calculated for the same period |
How the $6 million compares with ERA’s portfolio
The median funding amount across 390 ERA records in Funding Intelligence was $2.03 million. The first and third quartiles were $595,750 and $5 million. There were 155 records at $3 million or more, which puts Alberta-Pacific’s contribution in a sizeable group of larger projects. ERA project portfolio
390 records with a positive amount. Source: helloDarwin Funding Intelligence, public disclosures.
Scroll horizontally to see all columns.
Portfolio measure | Records |
|---|---|
All positive funding amounts | 390 |
At least $1 million | 260 |
At least $3 million, included above | 155 |
Project titles explicitly mentioning heat recovery | 4 |
The portfolio includes technologies across industries. The heat-recovery count comes from titles alone. Dates in the portfolio extract are insufficient for annual comparisons, and the amounts refer to ERA funding in Canadian dollars.
Make the case for heat recovery at your plant
Start by measuring both ends of the project. Characterize the temperature and availability of the exhaust stream, then identify when a nearby process actually needs the heat. An attractive yearly average can hide mismatched shifts, shutdowns or seasonal demand.
Build the investment case around useful energy delivered after exchanger losses, pumping, fouling and downtime. Set out how you’ll verify the result with operating data. At Alberta-Pacific the reported electricity and emissions figures depend on where the saved steam went. Another plant could use savings to reduce boiler fuel consumption, with a different calculation and different economics.
About the author