Services
Expertises
Resources
Who we are
Funding & Grants
By Ryan Remati-Paquette
Canadian grants specialist
Originally published November 2026; updated November 23, 2026

Alberta-Pacific’s $6 million pulp mill heat recovery project

Heat recovery equipment at an industrial pulp mill

Emissions Reduction Alberta (ERA) lists $6 million in funding for Alberta-Pacific Forest Industries’ kraft pulp mill heat recovery project. The mill used heat from its recovery boiler exhaust to heat water on site. That freed up steam to generate electricity. It also exposed the project to a problem any mill considering the technology would have to solve: how to keep the equipment working in a corrosive, particle-laden exhaust stream. ERA project profile

What the mill had to build and verify

The project installed a heat exchanger and stack connected to the recovery boiler. The exchanger used the exhaust to heat process water and preheat boiler feedwater. Corrosion-resistant stainless steel protected components exposed to the cooled gas. A daily water wash helped manage particulate buildup. The distinction matters for budgeting: the operating requirements determined some of the equipment and maintenance costs. Final project report

Scroll horizontally to see all columns.

Measure

What the project report describes

Project completed

2022, according to ERA

Operating period used for calculation

October 13, 2022 to September 11, 2023

Electricity attributed to steam savings

37,842 MWh, calculated from operating results

Associated emissions reduction

Approximately 14,118 tonnes of CO₂ equivalent, calculated for the same period

How the $6 million compares with ERA’s portfolio

The median funding amount across 390 ERA records in Funding Intelligence was $2.03 million. The first and third quartiles were $595,750 and $5 million. There were 155 records at $3 million or more, which puts Alberta-Pacific’s contribution in a sizeable group of larger projects. ERA project portfolio

ERA funding amounts in the portfolio
Show data as

390 records with a positive amount. Source: helloDarwin Funding Intelligence, public disclosures.

Scroll horizontally to see all columns.

Portfolio measure

Records

All positive funding amounts

390

At least $1 million

260

At least $3 million, included above

155

Project titles explicitly mentioning heat recovery

4

The portfolio includes technologies across industries. The heat-recovery count comes from titles alone. Dates in the portfolio extract are insufficient for annual comparisons, and the amounts refer to ERA funding in Canadian dollars.

Make the case for heat recovery at your plant

Start by measuring both ends of the project. Characterize the temperature and availability of the exhaust stream, then identify when a nearby process actually needs the heat. An attractive yearly average can hide mismatched shifts, shutdowns or seasonal demand.

Build the investment case around useful energy delivered after exchanger losses, pumping, fouling and downtime. Set out how you’ll verify the result with operating data. At Alberta-Pacific the reported electricity and emissions figures depend on where the saved steam went. Another plant could use savings to reduce boiler fuel consumption, with a different calculation and different economics.

How to compare your project with past funding awards

Related Tags
Funding & Grants
Add helloDarwin as a preferred source on Google

About the author

Ryan Remati-Paquette - Canadian grants specialist

Ryan Remati-Paquette

Canadian grants specialist
Working at helloDarwin for some time now, I'm in charge of providing you with the information you need on government aid. Dedicated to helping companies in Quebec and Canada reach their full potential, I write on the helloDarwin blog about the various programs, allowances and funding available to enable organizations to make their digital transformation through access to federal and provincial support.

See Related Articles

Timber wall framing in a prefabrication workshop
Funding & Grants
November 23, 2026

How three B.C. manufacturers used public funding to grow

Read more
Commercial truck at a freight depot
Funding & Grants
November 23, 2026

What Quebec’s Écocamionnage funding records reveal about fleet upgrades

Read more
Machine vision over a manufacturing conveyor
Funding & Grants
November 23, 2026

What funded AI projects look like on Canadian factory floors

Read more