Strategic Energy Management Program
Overview
At a glance
Funding available
- Implement environmental initiatives
- Increase operational productivity
- Reduce environmental footprint
- Varies by project
Eligible candidates
- All industries
- British Columbia
- All legal structures
- All revenue ranges
- All organization sizes
- Canadians
Next Steps
Availability timeline
Activities funded
- Energy studies and feasibility analysis
- Strategic energy management coaching and training
- Hiring and supporting on-site energy managers
- Energy-saving campaigns and employee engagement
- Equipment upgrades and energy-efficiency improvements
Documents Needed
- Application form or request submitted through a Key Account Manager or Regional Energy Manager
- Final proposal for a feasibility study, completed by an energy expert
- Paid invoices and completion documents for incentive payment
- Supporting documentation required by the agreement package
Sources and recorded changes
- Source change captured
- Change recorded
- Record updated
A captured source change or record update does not confirm eligibility. Check the funder’s current rules before applying.
Express study and feasibility study updates
BC Hydro added a new Express study page with funding, eligibility, and application details, and the Feasibility study page now limits the 25,000 kWh minimum to energy-efficiency projects.
The new Express study source now shows up to $2,500 per energy opportunity type and up to $12,500 total, and it adds eligible study types, exclusions, and customer thresholds for industrial and large commercial applicants. It also describes the application flow through a KAM or REM, workbook preparation, submission, payment processing, and using the completed workbook for later funding applications. The Feasibility study page also narrows its eligibility wording so the 25,000 kWh annual minimum now applies to energy-efficiency projects only, instead of energy-efficiency or low-carbon electrification projects.
Eligibility
Who is eligible?
- Industrial customers
- Large commercial customers
Who is not eligible
- Residential customers
- Organizations that do not meet the program’s electricity-use thresholds
- Businesses without the required BC Hydro account or contact support, where applicable
Eligible expenses
- Energy studies and audits.
- Design, equipment, installation, disposal of old equipment, and tax.
- Graphic design, printing, prizing, and event costs for energy-saving campaigns.
- Energy management consulting services and required training.
- Energy manager salaries.
Eligible geographic areas
- British Columbia
Selection criteria
- Energy savings potential
- Demand reduction impact
- Project feasibility and technical fit
- Performance against program targets
- Verified savings or milestone completion where applicable
How to apply
- Step 1: Contact BC Hydro representative
- Contact your Key Account Manager or Regional Energy Manager.
- If needed, contact the business help desk for guidance.
- Step 2: Prepare the application
- Work with an energy expert or contractor, if required by the program.
- Gather the proposal or supporting information needed for submission.
- Step 3: Submit the application
- Submit the application through the BC Hydro contact or online system specified by the program.
- For some programs, generate a contractor PIN or complete the relevant portal steps.
- Step 4: Complete follow-up requirements
- Sign the agreement package if approved.
- Proceed with project implementation and submit completion documents when required.
Processing and Agreement
- Applications are reviewed by BC Hydro after submission.
- Some programs include an engineering and financial review or a detailed assessment.
- Approved applicants receive an agreement package for signature.
- Funding is processed after required documents are submitted and project requirements are met.
- Some offers include verification checks or performance reporting after completion.
Additional information
- Applications are submitted through a Key Account Manager or Regional Energy Manager.
- Some offers require a signed agreement before funding is paid.
- Several programs use BC Hydro tools or portals for management and tracking.