Services
Expertises
Resources
Who we are
Grant for Upgrading Autonomous Septic Systems to Code - Canada
Open
Source verified September 8, 2026

Grant for Upgrading Autonomous Septic Systems to Code

Assistance for bringing septic systems into compliance
Offered by
Funding available
$ 49,500
Deadline
Open continuously
Location
Canada
Who can apply

The owner of an eligible property.

See full eligibility

Overview

The Septic System Compliance Grant program helps eligible owners in the watershed of the Saint-Charles River intake, in Quebec, Lac-Delage and Stoneham-et-Tewkesbury, with rates up to 90 % and 49 500 $. It supports the replacement of wastewater systems, dismantling, compliant installation and revegetation.
/100
Opportunity Score
Moderate potential, but conditions must align.

At a glance

Funding available

Financing goals
  • Implement environmental initiatives
Eligible Funding
  • Maximum amount : 49,500 $
Funds Providers

Eligible candidates

Eligible Industries
  • All industries
Location
  • Canada
Legal structures
  • All legal structures
Annual revenue
  • All revenue ranges
Organisation size
  • All organization sizes
Audience
  • All groups

Next Steps

1
Determine your project
2
Validate your eligibility

Availability timeline

2026
Periods: 1

Activities funded

  • Replacement of a domestic wastewater disposal, reception or treatment system.
  • Dismantling, decommissioning and disposal of the existing system.
  • Acquisition and installation of the new compliant system.
  • Revegetation of the site.
  • Sealing or drilling of a well when required.

Documents Needed

  • Copy of the municipal permit or authorization certificate, supporting documents, plans and specifications for the work and, where applicable, the notice of non-compliance.
  • Two detailed quotes from different contractors, dated no more than 90 days, unless the work has already been carried out between the 1April 2022 and the by-law takes effect.
  • Professional attestation for the replacement of a system whose age will not exceed 30 years before the 31 March 2029, with description of the system, hydraulic capacity, number of bedrooms and photos.
  • Detailed invoice for the work performed, certificate of compliance for the work and a copy of the engineer's invoice for the plans, supervision and compliance certification.
  • Report from a professional and cost study to benefit from the percentage and maximum amount of the tab 2 for a mandated tertiary system.

Eligibility

Who is eligible?

  • The owner of an eligible property.
  • The duly authorized representative of the owner.
  • The condominium syndicate or owners' association when the condominium property is managed by a syndicate or association.
  • The person who will act as the representative when the condominium property is managed by several owners not organized as an association.

Eligible expenses

  • Labor costs.
  • Cost of acquiring a compliant system.
  • Other materials supplied by the contractor, excluding those supplied by the owner.
  • Cost of issuing the permit or municipal authorization certificate, as well as professional fees for plans, specifications, supervision and compliance certification, including surveying or biologist fees when required.
  • GST and QST paid by the owner, less any amount recovered, if applicable.

Ineligible Costs and Activities

  • Replacement of a compliant system in order to increase its hydraulic capacity.
  • Work to repair or replace a structure, equipment or private infrastructure affected by the replacement of the existing system.
  • Excavation or landscaping work.
  • Materials purchased by the owner and work performed by the owner.

Eligible geographic areas

  • Watershed of the Saint-Charles River intake.
  • Vulnerability areas illustrated on the plans in Annex I.
  • Territory of the City of Quebec.
  • Territory of the City of Lac-Delage.
  • Territory of the municipality of the United Townships of Stoneham-et-Tewkesbury.

How to apply

  • Hire a soil study consultant to produce a report and plans; if the installation is less than 30 years old, the consultant must clearly justify its obsolescence.
  • Submit an application for a permit or authorization certificate after obtaining the soil study report.
  • Request at least two detailed quotes from qualified contractors or excavators.
  • Carry out the work and inform the consultant of the completion date so that they can produce the compliance report.
  • Once the work is completed, fill out the online grant application form.
  • Send the required documents by email to ISA.programme@ville.quebec.qc.ca.

Processing and Agreement

  • Within 60 days following receipt of a complete and compliant application, the City sends a check to the property owner.
  • If the application is incomplete or non-compliant, the City sends written notice indicating the missing or non-compliant items and no amount is paid until the file is completed.
  • If the application is not eligible, the City informs the applicant in writing within a period of 30 days and specifies the reason.
  • Compliant applications are granted in order of date received, subject to the availability of funds.
  • Any applicant who provided false, inaccurate or incomplete information may lose the grant reservation and must repay the amount received upon written request.

Additional information

  • The page summarizes the program for administrative purposes only and has no legal value.
  • Other terms may apply.
  • The program is made possible thanks to the Government of Quebec.

Contacts

Frequently Asked Questions about the Grant for Upgrading Autonomous Septic Systems to Code Program

What is the Grant for Upgrading Autonomous Septic Systems to Code?

The Septic System Compliance Grant program helps eligible owners in the watershed of the Saint-Charles River intake, in Quebec, Lac-Delage and Stoneham-et-Tewkesbury, with rates up to 90 % and 49 500 $. It supports the replacement of wastewater systems, dismantling, compliant installation and revegetation.

How much funding can be received?

Grant for Upgrading Autonomous Septic Systems to Code Funds up to $49,500 of admissible expenses.

What is the deadline to apply?

The program is accepting continuous intake

Who is eligible for the Grant for Upgrading Autonomous Septic Systems to Code program?

To be eligible for the Grant for Upgrading Autonomous Septic Systems to Code program, you must: The work must be carried out on an eligible property located in a vulnerability area. The property must be a detached dwelling served by a non-compliant system or one to be replaced on the recommendation of a professional. The work must have been carried out after the 1April 2022 and in accordance with the required permits.

What expenses are eligible under Grant for Upgrading Autonomous Septic Systems to Code?

Replacement of a domestic wastewater disposal, reception or treatment system. Dismantling, decommissioning and disposal of the existing system. Acquisition and installation of the new compliant system. Revegetation of the site. Sealing or drilling of a well when required.

Who can I contact for more information about the Grant for Upgrading Autonomous Septic Systems to Code?

You can contact Quebec City by email at isa.programme@ville.quebec.qc.ca or by phone at 418 641‑6186.

Where is the Grant for Upgrading Autonomous Septic Systems to Code available?

The Grant for Upgrading Autonomous Septic Systems to Code program is available across Canada.